Docs Clamp Cocrete Steel Wall Formwork Weld Clamp for Peri System
Contact Supplier
Product Highlights
- 2-Year Warranty Coverage: Comprehensive 2-year warranty provided for all mechanical defects and performance issues.
- High Tension Force Capacity: Engineered to withstand a maximum tension force of 20kN for secure panel connections.
- Optimal Clamping Range: Designed with a maximum clamping distance of 220mm for versatile formwork applications.
- Electro Galvanized Finish: Features electro-galvanized surface treatment for enhanced corrosion resistance and durability.
- ISO Certified Quality: Manufactured under strict ISO certification standards ensuring high product reliability.
- Precision Frame Alignment: Ensures accurate alignment of panel frames to maintain structural integrity during construction.
- Forged Wedge Pin Design: Utilizes a forged wedge pin mechanism for quick and tight locking of formwork panels.
- 25 Years Manufacturing Experience: Backed by 25 years of industry expertise in producing high-quality scaffolding and formwork accessories.
Product Attributes
- Customization
- Available
- After-sales Service
- 2years
- Warranty
- 2years
- Certification
- ISO
- Material
- Steel
- Type
- Stair Formwork
- Transport Package
- Steel Pallet
- Specification
- 4.3kg
- Trademark
- WEIYE
- Origin
- Rizhao
- Package Size
- 50.00cm * 50.00cm * 20.00cm
- Package Gross Weight
- 4.500kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Docs Clamp Cocrete Steel Wall Formwork Weld Clamp for Peri System
Find Similar Products
Product Description
This is one of the mostly used clamps in formwork shuttering panel connection system. The max distance for it to clamp is 220mm. It can keep alignment of the frames of the panel. After that, hammer the forged wedge pin to tight it. The. tension force is 20kn.
| Component Name | Size | Finishing | Unit Weight (kg/pc) |
| Formwork Alignment Clamp | 288 | Electro Galvanized | 4-4.2kg |
Rizhao Weiye Tools Co.,Ltd. is a leading manufacturer of system scaffoldings and accessories, forged couplers, plank, shoring props, formwork accessories, fences, ladders, frame scaffolding and other related products in Rizhao City, Shandong, China.
We have been in the business for 25 years, and all our products are BS 1139 and EN 74, AS 1576 certified, the quality is very good. Our products are very popular in European countries, Australia, North America, Mid-east countries, and South East Asia and some African countries, etc.
Currently, we have well-trained workers of more than 300, advanced forging lines of 10 and many other advanced equipment. We are also capable of tooling designing, performance testing, new products researching and developing. We have two factories taking up to 160000 square meters. With years of development, we can reach a production capacity of more than 20 containers per month. We are growing all the time.
We have our own zinc plating and powder coating workshops and cast steel/cast iron part processing workshop, which enable fastest delivery and most consistent quality of the products.
We are looking forward to establishing long term business relationship with you in the near future!
Main Business:
1. System scaffolding:
Include: Kwikstage system scaffolding and accessories; Ringlock system scaffolding and accessories; Cuplock system scaffolding and accessories; Haki system scaffolding and accessories.
2. Couplers/Clamps:
We can manufacture all kinds of drop forged or pressed couplers, include: British type couplers, Italian type couplers, German type couplers, American type couplers, and many other kinds of couplers as per your drawings.
3. Façade scaffolding:
Mainly include: European Façade Scaffolding, Italy type Façade Scaffolding, and some domestic frame scaffolding.
4. Shoring Props
Quality shoring props of different specifications can be manufactured in our factory.
5. Planks/ Toe Board:
Both aluminum and steel planks can be manufactured automatically in our factory.
6. Formwork Accessories:
Both Forged wing nut and casted wing nut, steel rebar tensioner, Rapid Wedge Clamp and some other formwork accessories.
6. Others
We can also manufacture fences, ladders, steel trays/stillages and other related products that are needed in the erection of scaffolding.
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2451617". Items marked "" are certified.
Company Profile
Rizhao Weiye Tools Co., Ltd. is a leading manufacturer of system scaffoldings and accessories, forged couplers, plank, shoring props, formwork accessories, fences, ladders, frame scaffolding and other related products in Rizhao City, Shandong, China.
We have been in the business for 25 years, and all our products are BS 1139 and EN 74, AS 1576 certified, the quality is very good. Our products are very popular in European countries, Australia, North America, MID-east countries, and South East Asia and some African countries, etc.
Currently, we have well-trained workers of more than 300, advanced forging lines of 10 and many other advanced equipment. We are also capable of tooling designing, performance testing, new products researching and developing. We have two factories taking up to 160000 square meters. With years of development, we can reach a production capacity of more than 20 containers per month. We are growing all the time.
We have our own zinc plating and powder coating workshops and cast steel/cast iron part processing workshop, which enable fastest delivery and most consistent quality of the products.
We are looking forward to establishing long term business relationship with you in the near future!
Main Business:
1. System scaffolding:
Include: Kwikstage system scaffolding and accessories; Ringlock system scaffolding and accessories; Cuplock system scaffolding and accessories; Haki system scaffolding and accessories.
2. Couplers/Clamps:
We can manufacture all kinds of drop forged or pressed couplers, include: British type couplers, Italian type couplers, German type couplers, American type couplers, and many other kinds of couplers as per your drawings.
3. Facade scaffolding:
Mainly include: European Faç Ade Scaffolding, Italy type Faç Ade Scaffolding, and some domestic frame scaffolding.
4. Shoring Props
Quality shoring props of different specifications can be manufactured in our factory.
5. Planks/ Toe Board:
Both aluminum and steel planks can be manufactured automatically in our factory.
6. Formwork Accessories:
Both Forged wing nut and casted wing nut, steel rebar tensioner, Rapid Wedge Clamp and some other formwork accessories.
7. Fencing and Guardails:
A full range of crowd control barrier and fencings are in supply.
8. Others
We can also manufacture ladders, steel trays/stillages, wrenches and other related products that are needed in the erection of scaffolding.
About Our Factory & Business Background
- Address
- Lijiahu Village, Gaoxing Town, Lanshan District, Rizhao, Shandong, China
- Terms of Payment
- LC, T/T, PayPal, Western Union, Small-amount payment, ****** Trade Assurance
- International Commercial Terms(Incoterms)
- FOB, EXW, CFR, CIF, CIP, CPT, FCA
- Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays - Nearest Port
- Qingdao Port
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2012-02-01
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is the warranty period for this clamp?
- We provide a 2-year warranty covering mechanical defects and performance issues.
- What is the maximum clamping distance?
- The maximum distance for clamping is 220mm.
- What is the tension force capacity?
- The clamp is designed to handle a tension force of 20kN.
- What material is used for this clamp?
- This clamp is made of steel with an electro-galvanized finish.
- Does the product have any certifications?
- Yes, the product is ISO certified and meets BS 1139, EN 74, and AS 1576 standards.
- How is the clamp secured?
- It is secured by hammering the forged wedge pin to tighten the connection.
- What is the weight of the clamp?
- The unit weight is between 4kg and 4.2kg per piece.
- What is the lead time for orders?
- Lead time is within 15 workdays during off-peak season and one month during peak season.
Send your message to this supplier
People who viewed this also viewed
-
US$1.80-5.00 / Piece
-
US$1.80-5.00 / Piece
-
US$790.00-900.00 / Ton
-
US$0.50-5.00 / Piece
-
US$900.00-960.00 / Ton
-
US$9.00-10.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Formwork Accessories
- clamps
- Docs Clamp Cocrete Steel Wall Formwork Weld Clamp for Peri System
Related Categories
Hot Searches
- China Formwork Factories
- Clamp Set Factories
- Steel Clamp Factories
- Stainless Clamp Factories
- Construction Clamp
- Coupler Clamp
- Used Scaffolding Clamp
- Coupler Scaffold Clamp
- Frame Scaffolding Clamp
- Top 10 Formwork
- Formwork Trends
- Clamp and Coupler Bulkbuy